Saturday, March 12, 2016

March progress

With most of the upper deck of the west peninsula wired, I added some facia to see how it would look.


I need to secure it better and trim the top to match the profile and paint, but this gives a pretty good idea what it will look like. I also need to clean up a little.

I operated with Eric Mumper on March 1, which is always fun. Eric models the Fox River Branch of the CB&Q in the transition era. He's my go to guy for all things Burlington around here.




I started adding a lower deck. I used 1x4 joists. Mostly salvaged from the club layout.


The deck is pretty high grade 3/4" plywood. I like to be able to put track right on the plywood if necessary.



No comments:

Post a Comment