Showing posts with label Yard. Show all posts
Showing posts with label Yard. Show all posts

Saturday, December 31, 2016

Holiday update

I took a couple weeks off after the DFW Interchange but one thing that was nagging at me was the lack of staging. I remember reading that my SP&S buddy Bob Willer in Kansas City had written a short article in Model Railroad Planning a while back describing his battleship staging yard. This is portable staging yard that can be moved around as needed. I decided something similar was in order.



Starting with the 4 dominoes from the switching layout that Matt Latham and I built for the 2013 LSR convention in Irving, I started working on a staging yard ladder that takes off from the end of the layout near the Yellowstone River bridge. The staging yard track is also salvaged. I used Altas #6 switches from the old layout and Micro Engineering code 83 flex track. The old switching layout had 1/2" Homasote covering it.



A couple weeks later, another domino and more track. I wasn't working on the layout ever night like I was leading up to the DFW Interchange.


By the second week of December I had use all four dominoes and all the track from the switching layout, but a test showed is wasn't quite long enough. Oh, and I had wired the lead so that trains didn't stall out.


By Christmas, I was able to show my mom my layout progress. A lot of changes since she had seen it.


By the end of December I had added a 5th domino and had all the track in, making the staging yard 20 feet long. It will be interesting to see how I move it.

Monday, August 1, 2016

July Progress

July was a very busy month. After the open house in June the layout room was clean and ready to be torn up again. Of course, the bad thing is that when the room is clean I can never find my tools, so I spend most of my time hunting.

After the convention, this is what the Billings yard looked like. I needed to figure out a way to get the turntable pit installed close to the backdrop.

Yard looked like a stub yard at the beginning of July.

I decided to cut a template with a big plunge router and then use a trim router to cut the actual hole. 

Here is the crappy trim router from Harbor Freight. It died about 3/4 of the way through and I had to finish with a rotozip.

This is what the hole looked like before I removed the template.

And with the pit dropped in. I still need to get the correct screws to hold it firmly in place.

It didn't take long to lay the rest of the yard tracks.

A closer view of the west end of the yard ladder.

I had to insert ties in the gaps where the flex track comes together.

At the end of July I went to Durango, Colorado with Speed to take the Soundtraxx Academy. It was a lot of fun and one of the highlights was seeing their surface mount assembly floor. Here is a production worker testing decoders using a functional tester that they have special built to emulate a locomotive.  

We rode the Durango and Silverton on Saturday with the Soundtraxx group.

On Sunday we went over to Chama and rode the Cumbres and Toltec. It was a spectacular weekend and I highly recommend it to anyone.