Wednesday, November 11, 2015

Hardin benchwork and roadbed

I have always admired the sweeping curves created with the use of splines for sub-roadbed. When I got Joe Fugate's original set of DVDs, he presented a way to make spline roadbed from Masonite where you didn't have to put cork on top. With the large new space and the new layout, I decided it was time to try it. 

I found some 1/4" Masonite at the local 84 Lumber since neither of the big box stores stock it. I called around and found a place that would rip it into 7/8" strips, saving me a lot of time on the table saw. Here is what 4 sheets look like cut into strips.



I decided to use 3/4 cabinet plywood rather than the 1/2" I had purchased and luckily Home Depot had some at a reasonable price because I discovered the plywood I had been storing in my pole barn had gotten damp and was delaminating.


It took some time to curve the plywood to fit the backdrop - especially since I couldn't find my belt sander. Of course, a couple days after getting it to fit with saws and a disk sander, my wife found it in a box in the garage that hadn't been unpacked yet a over a year after the move. Lance Lassen came over and we put down some cork and the first splines. Hardin is to Lance's left in this photo. Sheetrock screws are being used to put an s-bend in the Masonite.



This is the first time I have tried spline. The first lesson I learned is to connect the Masonite to the plywood at the start. After reading some of the experiences other people have had, I tried making a notch in the plywood with a reciprocating saw on the third piece, but it looks like I'll need some additional stiffening.


The spline seems to be doing a pretty good job holding its shape with the clamps and sheetrock screws removed.


One more set of splines and clamps. I also want to have the roadbed on passing sidings lower than the main. I am doing this using some n-scale cork.


This morning I took the clamps off and this is what it looked like. It wasn't until I put this photo up that I realized that I have 7 instead of 6. Oops, I guess I got a little spline crazy. I plan on playing around with 45 degree profiles anyway, so I may be routing the first ones.


Tonight, I will work on roadbed for the first turnouts, including my first ever spline. I'll try to remember to take more photos as I go. 

Here are some links that I found priceless when researching spline roadbed:


Leave a comment if you can think of some others - especially videos.



Thursday, October 29, 2015

Prototype Inspiration

I haven't done much on this blog about the prototype in Northern Wyoming and Southeastern Montana since my first post. Most of the discussion on the prototype railroads have been on a Facebook group I created some time ago to collect photos and stories about railroading in this part of the country. I invite you all to take a look and participate at the Sheridan and Everywhere West Facebook Group.


Sunday, October 25, 2015

Joists

Chris Palmieri brought his some Jacob over Sunday and we put up some joists and cut some decking.


Hopefully the section house is level, because for now, at least the benchwork is.


Chris did a complete write up on his visit on his blog. The Meridian Speedway.


Saturday, October 24, 2015

Backdrops

Had some help from the family putting up some backdrops. Decided to continue with 1/4" sheetrock because of cost and ease to work with. I have a lot of 1/8" Masonite, so I may move to that material in the future.


Once I taped and mudded the sheetrock, I put some paint on the backdrops. I went with a Home Depot Behr color called Aztec Sky. 


Friday, October 16, 2015

A little paint.

It turns out that Devoe Upland Green is no longer available at Sherwin Williams or any other paint store around here, so I grabbed a few cards and picked a couple shades that I felt were close to the US&S CTC machine boxes. Here are a couple shots of the painted valance.



Since painting, I've mostly been cleaning up so I have room to work.

Friday, June 26, 2015

Back to testing deck heights.

With some valence lights up, I decided to put the temporary shelving units back on and see how comfortable things were with the decks at the planned 45 and 64.5 inches.




The upper shelf is 18" wide and the lower is 24". The Valance is roughly 24" wide, but varies some around the curve. I cut the Masonite to 9" strips, which seem to cover the bulbs the way they hang. I don't have a feel yet for how deep the upper shelf will be. You can see that I have several pieces of 4" foam leaning against the wall. I'm not sure if I will use that as benchwork, or save it for scenery.

I also haven't figured out a good way to connect the valance. For these two pieces, I just used roofing nails to connect the Masonite to the 2x3 joists I built the valance with. I'll probably go back to screws, but this was quick and the screws I had were too long. The problem is butting the pieces together. I think I need a good, solid piece to stitch them together. My first thought is to use a 6" wide piece of Masonite and glue the pieces with Liquid Nails, but I had very poor luck getting the rough side of Masonite to stick using Liquid Nails on my old layout. Let me know your thoughts.

Interviewed about the layout and section house

Some of you might be interested in hearing the interview I did with Lionel, Jim and Bruce on a Modeler's Life Podcast. It started when Lionel asked for photos of people listening to the podcast. I was out mowing and took this shot of me on the tractor in front of the section house.


In May, Lionel contacted me on Facebook to ask if I'd like to talk about the section house. I said that was fine, so I got on Skype and this is what happened:


Sunday, June 21, 2015

Valance lights

When I operated at Dean Ferris' last weekend, I asked him about his valance lighting. He said he Googled Barn Dance Lights and said he was using strings of standard light CFL light bulbs spaced 24" apart. I found his source, and ordered 220 feet of lights with 150 sockets spaced 18".

http://www.noveltylights.com/25-White-Commercial-Grade-stringer-e27-Medium-Base.html

I picked up some 13W Daylight CFL bulbs at Home Depot for $19.99 a 12 pack. One string used two boxes plus one and got me just over half way around the peninsula. Somewhere I have a bunch of masonite cut into strips that I am planning on using for the valance, but who know where that is. I thru up a temporary piece of  Homasote that was 10" wide just to see how it looked.



May's big project.

I didn't get much done in the section house in May other than perhaps adding the most important accessory back. When I took out the toilet, I had decided to make a small power room in the closet between the two A/C units. Then it started raining. I didn't really want to go play in the mud under the building, so I hired a guy to move the plumbing. What should have taken a couple days wound up taking several weeks. Luckily we negotiated a flat fee, so I didn't pay him any more. The plumbing all works, but I still need to paint and do some more finish work.

Monday, May 11, 2015

April progress

With 2.5 acres of lawn to mow, progress slowed quite a bit in April as more and more of my free time was taken up with yard work. I did get the valence hung over the peninsula, and here are some photos.